Mobile Version Government Agencies
:Visit the GPRS Facebook Page Visit GPRS on Twitter Visit the GPRS YouTube Channel Visit the GPRS Blog
gpr email
 
Why Call?
 
 
 
 

Lake Erie Electric

When Lake Erie Electric needed to make 6” diameter penetrations through a concrete floor at the Cleveland Clinic Foundation, they first contacted Ground Penetrating Radar System, Inc. Lake Erie needed to make these penetrations without cutting any rebar.  There were two mats of rebar on 12” centers at the top and the bottom of the structural slab.  Ground Penetrating Radar was used for mapping rebar at each location and all holes were drilled without incident.

Ground Penetrating Radar System

Concrete scanning for the purposes of laying out rebar and post-tensioning prior to core drilling is the service we perform most regularly at Ground Penetrating Radar System.  The Cleveland Clinic sees the value in scanning prior to cutting and often requires concrete to be scanned with Ground Penetrating Radar prior to any penetrations being made. 

Cleveland Clinic

Jamie can be reached at 330-352-0145 or by e-mail at Jamie.althauser@gp-radar.com.

 

Privacy Policy

gpr email